Accreditation & compliance
Without an accredited installer on site, the job cannot create certificates — and the business has no product
2 items need attention
Everything Wattlebank sells rests on one thing: an accredited installer physically on the roof. Not supervising from the van, not signing off afterwards. If that cannot be evidenced, the certificates for that job are void, and a pattern of it costs the accreditation itself — at which point there is no business, only a warehouse full of panels.
Jobs with weak attendance evidence
4
All subcontract
Accreditation expiring in 90 days
2
Of 4 accredited installers
Electrical licences current
9 of 9
Checked monthly
Audit findings open
3
From the March desktop audit
Who can sign a job off
Four accredited installers cover five crews · the arithmetic is the problem
| Installer | Crew | Accreditation | Expires | Days | Electrical licence | Jobs signed, 12m | Standing |
|---|---|---|---|---|---|---|---|
| Wes Tuilagi | Tuilagi | Design & install | 14 Jun 2027 | 293 | Current | 318 | Clear |
| Jarrod Neale | Neale | Design & install | 2 Feb 2027 | 161 | Current | 286 | Clear |
| Rohan Prasad | Prasad | Install | 20 Sep 2026 | 26 | Current | 241 | Renewal not started |
| Kabelo Mbatha | Mbatha | Install | 11 Nov 2026 | 78 | Current | 198 | Expiring |
| Sean Doherty | Subcontract | Install | 4 Apr 2027 | 222 | Current | 137 | Attendance queries |
Rohan Prasad's accreditation expires in 26 days and he signed 241 jobs last year. If it lapses, his crew cannot work — not slowly, at all.
Proving somebody was there
How each job evidences the accredited installer on site
| Method | What it proves | Jobs | Share | Strength |
|---|---|---|---|---|
| Geotagged check-in and check-out | Present, and for how long | 874 | 74% | Strong |
| Timestamped site photographs | Present at a moment | 198 | 17% | Partial |
| Signed job sheet only | That somebody signed a form | 104 | 9% | Weak |
| Nothing on file | — | 4 | 0.3% | None |
A signed job sheet proves a signature. It does not prove attendance, and in an audit that distinction is the whole conversation.
All four jobs with nothing on file are the subcontract crew, and 71 of the 104 signed-sheet-only jobs are too. Wattlebank pays that crew per install and inspects the paperwork afterwards, which means the one control that matters is the one nobody applies at the time. Check-in on the tablet takes four seconds and removes the entire category.
March desktop audit
Twelve jobs sampled · three findings still open
| Finding | Jobs | Raised | Response due | Status |
|---|---|---|---|---|
| Array photographs not sufficient to verify panel count | 4 of 12 | 18 Mar | 15 Apr | Responded, open |
| Serial numbers not legible | 3 of 12 | 18 Mar | 15 Apr | Responded, open |
| Attendance evidence weak on one job | 1 of 12 | 18 Mar | 15 Apr | Escalated |
| Written statement version out of date | 2 of 12 | 18 Mar | 15 Apr | Closed |
| Component list current | 12 of 12 | 18 Mar | — | No finding |
Seven of twelve sampled jobs had a finding. The sample was random, which means the rate across all 1,180 is probably similar — and Wattlebank has never measured it.
Consumer code
Signatory statusCurrent
Cooling-off honoured100%
Written quotes with full disclosure98%
Complaints, 12 months14
Resolved within the standard12 of 14
Six complaints were about export limits. The customer was approved at a lower export limit than they were sold, found out from their first bill, and nobody had rung them. That is a disclosure failure, not a technical one.
What would fix most of it
- Check-in on the tablet
- Serial capture that validates
- Array photo prompt from height
- Job cannot close without the pack
None of this is sophisticated. It is a checklist that will not let a crew leave, which is the only kind of checklist that works on a roof at four o'clock on a Friday.